Filming Permit in Morocco: How to Get Your Shooting Authorization

A filming permit in Morocco is mandatory for every professional shoot, from a one-day commercial to a feature film. It is issued by the Centre Cinématographique Marocain (CCM), and a foreign production cannot apply for it directly: the request must be filed by a Moroccan production company authorized by the CCM. This guide explains who applies, what goes into the file, how long it takes and which extra authorizations you may need on top of the main permit.

Who issues the film permit in Morocco?

The CCM, under the Ministry of Culture, is the central authority for shooting authorizations. Once the CCM has issued the permit, it becomes the basis for the other approvals you may need: local authorities for public spaces, specific administrations for sensitive sites, and owners or managers for private locations.

The legal framework changed recently. Law 18-23 on the film industry came into force on 1 September 2025, and production companies had until 31 August 2026 to comply with the new rules. In practice, before you sign with a Moroccan partner, ask for proof that its CCM authorization is valid under the current law. Permits already issued under the old rules stayed valid until the end of their shoots.

Do foreign productions need a local company?

Yes. The request is signed and filed by the manager of a Moroccan company approved by the CCM to provide production services. That company is your legal representative in the country: it files the paperwork, deals with the administrations and answers for the shoot on the ground. Your foreign company gives it a letter of accreditation (a mandate) to act on your behalf.

For a small crew, a fixer can coordinate the logistics, but the permit itself still goes through an authorized production company.

What documents do you need for a shooting authorization?

The exact list depends on the format, and the CCM can ask for more. Based on the requirements published by the CCM at the time of writing, expect to provide:

  • the completed and signed shooting authorization form;
  • the script and a synopsis (the CCM lists French or Arabic) or, for short formats, a treatment;
  • the letter of accreditation from your company to the Moroccan service company;
  • the crew lists: foreign technicians and Moroccan technicians, plus the contracts of the local crew;
  • the shooting schedule and the list of locations;
  • insurance: civil liability and work accident cover;
  • proof of payment of the permit fee, set by the CCM’s official rates (see the CCM filming permits page).

Any later change of dates, locations or crew must be reported to the CCM. Keep the file up to date: an outdated crew list or schedule is one of the most common reasons for delays.

How long does it take to get a filming permit in Morocco?

The CCM publishes processing times that vary by format: shorter for commercials and corporate films, longer for feature films, series and documentaries. Add the time needed to collect the documents and to obtain location-specific approvals, and plan for up to around four weeks for a standard shoot.

Three things make it longer:

  • drones, which follow a separate procedure (see below);
  • sensitive locations: airports, ports, train stations, military or administrative areas, royal palaces, some religious sites;
  • late changes to the schedule or the crew after the file has been filed.

The practical rule: send your script, dates and crew list to your Moroccan partner as soon as the project is confirmed, not once the crew is booked.

Location permissions: public spaces, sensitive sites and private property

The CCM permit is the key that opens the other doors, but it does not replace them. On top of it, your production company deals with:

  • local authorities (wilaya, prefecture or province) for streets, squares, medinas and roads, especially if you need to block traffic or control access;
  • the police or gendarmerie, who are informed and may be present on set for public-space shoots;
  • specific administrations for sensitive sites, which can take longer and sometimes refuse;
  • owners and managers of private places: riads, hotels, shops, offices, farms;
  • image release forms from people who are recognizable on screen.

Medinas such as Marrakech or the streets of Casablanca are busy places: a good location manager negotiates with residents and shopkeepers as much as with the administration. To compare regions before you scout, see our overview of filming locations in Morocco.

Drone operator flying a camera drone at sunset: aerial filming needs a separate permit in Morocco

Drone filming permit: a separate procedure

Aerial shots are not covered by the main shooting authorization. A drone flight needs its own approval, granted at provincial level with the CCM permit as a prerequisite and with the security forces informed. Each authorization covers a specific mission: if the dates or the flight zone change, a new request is needed. Count several extra weeks, and more if the drone has to be imported.

Importing a drone is the most delicate part: never bring one in your luggage without the paperwork arranged in advance. Renting a drone and a certified pilot locally is usually faster. Details on our drone permit page.

Bringing your equipment: customs

Morocco accepts the ATA carnet for the temporary import of professional equipment. Your production company prepares the customs side with the shooting authorization, and the gear must leave the country at the end of the shoot. To limit customs formalities, many productions rent cameras, lighting and grip locally: see our camera rental and film equipment services.

Common mistakes that delay a permit

  • starting the file too late, once flights and crew are already booked;
  • a script or synopsis that does not match what is actually shot;
  • changing locations or dates without informing the CCM;
  • forgetting the drone or a sensitive location in the initial request;
  • arriving with undeclared equipment at the airport.

Frequently asked questions

Can a foreign company apply for a Moroccan film permit directly?

No. The request is filed by a Moroccan production company authorized by the CCM, which acts as your local partner and representative throughout the shoot.

Do I need a permit for a small crew or a commercial?

Yes. Commercials, music videos, corporate films and documentaries also need a CCM shooting authorization. Processing is usually faster for short formats, but location and drone approvals still apply.

Is the drone included in the shooting authorization?

No. Drone flights follow a separate procedure, with its own approvals and longer timelines. Include the drone in your plan from the start.

Does the filming permit give access to the 30% rebate?

No, they are two separate procedures. The rebate is a distinct application, filed before the shoot through a Moroccan production company, with its own conditions on format, local spending and number of shooting days.

Get your Morocco shooting permit started

Send us your script, dates, locations and crew list: we check feasibility and tell you exactly which authorizations your shoot needs and how long they will take. Contact our production team